Our project of building a showcase worthy Silver Eagle began with the dismantling of an old Silver Eagle airframe. We removed all quality components necessary for conversion including the engine mounts, the extension of the cowlings, Jet A fuel lines, and much more. We began to strip the engine cowling and wheel wells down to the aluminum to cover them in a fresh new coat of paint.

Cessna P210N Before Conversion

Cessna P210N Before Conversion

Silver Eagle Base

Cessna P210N Before Conversion

Cessna P210N Before Conversion

Converting to Silver Eagle

Cessna P210N Before Conversion

Cessna P210N Before Conversion

Removing Piston Engine

Cessna P210N Before Conversion

Cessna P210N Before Conversion

Engine And Cowlings Removed

Cessna P210N Before Conversion

Cessna P210N Before Conversion

Old Silver Eagle And New Silver Eagle

Cessna P210N Before Conversion

Cessna P210N Before Conversion

Tail Apart For Tail Mod

Cessna P210N Before Conversion

Cessna P210N Before Conversion

New Turbine Motor Mount

Cessna P210N Silver Eagle

Cessna P210N Silver Eagle

Silver Eagle Used For Parts

Cessna P210N Firewall

Cessna P210N Firewall

Firewall Before We Worked On It

Cessna P210N Before Conversion

Cessna P210N Before Conversion

Nose Gear Compartment Before Paint

Cessna P210N Panel Torn Apart

Cessna P210N Panel Torn Apart

Piston Plane's Panel Torn Apart, Preparing For New Wiring

Cessna Piston P210N  Sidewall

Cessna Piston P210N Sidewall

Removing All Old Wiring For New Wiring

Newly Fabricated Panel

Newly Fabricated Panel

New Panel Cut From 0.090 Inch Thick Aluminum

Newly Fabricated Circuit Breaker Panel

Newly Fabricated Circuit Breaker Panel

New Style Main Circuit Breaker Panel

After the mounts and cowling extensions were installed we began installing the cowling air ducts and fine-tune the cowlings. We started to run new avionics and electrical system wiring. New gear doors were installed and fit to perfection. All fuel lines were replaced with proper lines removed from the old conversion. New baggage fuel tanks were installed and the new LED nav/strobe/beacon lights were fit.

Extended Cowling

Extended Cowling

Added Extended Cowling for Elongated Engine Compartment

Body Work

Body Work

Added Air Scoop For New Engine Compartment

Body Work

Body Work

Added Air Scoop, Blending Of Cowling

Added Extension

Added Extension

Newly Add Cowling Extension For Elongated Engine Compartment

Engine Mount

Engine Mount

Turbine Engine Mount Placed In Engine Compartment

Gear Doors

Gear Doors

Added Gear Doors To Airframe

Cycling Gear Doors

Cycling Gear Doors

Cycling Of Gear Doors

Gear Doors

Gear Doors

Gear Doors Fit To Perfection

New LED Nav Lights

New LED Nav Lights

New LED Nav Light With New Wiring And Mounting Bracket

All New Wiring in Tail

All New Wiring in Tail

Running All New Wiring In Tail To Servos, Lights, And Switches

Baggage Fuel Tanks

Baggage Fuel Tanks

26 Gallon Baggage Fuel Tanks with Dual Pumps

Wiring

Wiring

Behind the Panel While Wiring All New Avionics

New Panel Before Powder Coating

New Panel Before Powder Coating

New Silver Eagle Panel Before Powder Coating

All prep was complete, the engine compartment and wheel wells were taped off and painted gunmetal gray. The floor in the cabin was cleaned up and all old insulation was replaced with new sound X insulation. Aerodynamic covers were fabricated for the new LED lights. Nose gear trunnion assembly and main landing gear assembly's were dismantled, powder-coated, and reassembled with new hardware. 

Begin Painting Of Engine Compartment

Begin Painting Of Engine Compartment

Start Of the Detailing Of Engine Compartment

Finished Painting Of Engine Compartment

Finished Painting Of Engine Compartment

Detailing Of Engine Compartment Is Complete

Fitting Of Cowling

Fitting Of Cowling

Engine Mount In While Fitting Cowling

Fitting Engine Cowling

Fitting Engine Cowling

Fitting Engine Cowling

Nose Wheel Well

Nose Wheel Well

Detailing Of Nose Wheel Well

Nav Light Cover

Nav Light Cover

New Cover Plate For LED Nav Lights

Begining Of Painting

Begining Of Painting

Taped Up Plane, Waiting To Be Painted

Prepping For Paint

Prepping For Paint

Taped Up And Waiting Of Paint

Cover Plate For Nav Light

Cover Plate For Nav Light

New Fabricated Cover Plate For LED Nav Lights

Nose Gear Disassembled

Nose Gear Disassembled

Nose Gear Disassembled And Powder Coated

main Landing Gear

main Landing Gear

Main Landing Gear Powder Coated White

Nose Gear Trunnion

Nose Gear Trunnion

Nose Gear Trunnion Powder Coated

All landing gear components were installed and the plane was painted a streamlined blue and silver scheme. Avionics wiring was finishing up and tying up.

20210205_170255

20210205_170255

20210205_170300

20210205_170300

20210205_170207

20210205_170207

20210205_170245

20210205_170245

New Paint On N128EE

New Paint On N128EE

New Paint Job On N128EE, Conversion Plane

New Paint On N128EE

New Paint On N128EE

New Paint Job On N128EE, Conversion Plane

New Paint On N128EE

New Paint On N128EE

New Paint Job On N128EE, Conversion Plane

Upper Wing Of New Paint Job

Upper Wing Of New Paint Job

New Paint Job On N128EE, Conversion Plane

20210205_170430

20210205_170430

20210205_170451

20210205_170451

20210205_170500

20210205_170500

20210205_170444

20210205_170444

Main Gear Well

Main Gear Well

Main Gear Well Detailed And Painted

Main Gear Well

Main Gear Well

Main Gear Well Detailed And Painted

Nose Gear Well

Nose Gear Well

Nose Gear Well Detailed And Painted

Tied Up Wiring In Sidewall

Tied Up Wiring In Sidewall

New Wiring To Avionics And Tail All Tied Up

Avionics Under Bench Seat

Avionics Under Bench Seat

New Avionics Mounted Under Bench Seat